Field notes.

Camps, abatement, industrial construction — written like a job, not a brochure.

2026-08-12

Installing a mining camp in Quebec

A camp is not a row of trailers. It is a pad that holds, a lift plan, and a sequence that survives winter.

2026-08-19

Asbestos abatement in a camp

A worker dorm with asbestos is a construction job with a contaminant. Sequence first.

2026-08-26

Mould in prefabricated modules

A mouldy dorm is not housekeeping. Containment and removal.

2026-09-02

Lifting modules — the plan

A 60-foot dorm does not fly on a wish. It flies on a plan.

2026-07-28

Civil works for a camp pad

If the gravel is not drained, the modules move.

2026-07-15

Selective demolition with asbestos

Open only what must come out.

2026-06-30

QHSE as a mining subcontractor

Procedures on the ground. Not a lunchroom poster.

2026-06-18

Trois-Rivières as a base for Abitibi

Head office in Mauricie. Crews on the mining road.

2026-05-27

Industrial restoration after a loss

The loss opened the building. We clean it, then we close it.

2026-05-14

Mobilizing a James Bay job

Access, season, rooms. Priced in the mandate.

2026-04-22

Air controls on the job

The numbers come from the lab, not from us.

2026-04-08

FIFO crews on remote jobs

The camp is not a hotel contract. It is rooms for a crew that builds.

2026-09-09

Industrial abatement is not housekeeping

A dirty camp is not a contaminated camp. Housekeeping is the operator. Asbestos, mouldy gypsum and HEPA containment are another trade.

2026-09-05

Camp integrator, not manufacturer

A camp is a supply chain. Structures, skids, kitchen, network. We put them together. We do not pretend we welded them all.

2026-08-05

Preliminary camp design

A 136-bed camp is thought through before the first pile. The study says whether it holds. Execution drawings seal with the file’s engineers.

2026-07-08

Nordic camp thermal envelope

SOPRA-ISO lists R-5.7 per inch at 24 °C. A camp at −40 °C is not sized from that line alone. We stack, we derate, we say so.

2026-06-04

CSA A277 and the prefab camp

An A277-certified module arrives cleaner. It does not arrive cribbed, anchored and tied in. That is the jobsite.

2026-03-18

Canadian sourcing for a mining camp

Pro-Fab, Toromont, H2O Innovation, Soprema: plants that exist. That is not “LPT signed with”. It is a chain we know how to call.

2026-03-04

Demobilizing a mining camp

A camp at end of life is not a yard sale. Lift before you sample, and you spread it. Sample first, and modules can still be reused.

2026-02-18

48-hour camp feasibility study

We can frame a pilot in two days if the site is known. We do not set 136 beds in two days. Keep the two sentences apart.

2026-02-04

Aqua-Loop: water on a nordic camp

136 people, two meal services, showers, kitchen, laundry. Without a loop and freeze protection, the camp stops. The study says so. The seal is still not ours.

2026-01-21

Nordic camp microgrid

A lone generator hunts and wears out. A 136-bed camp has a peak, a night, and solar that does not produce in December. That gets sized.