Asbestos in a camp or a mill is a construction job with a contaminant. We plan it that way.
Air numbers come from an independent lab. We do not run that lab.
What abatement includes
Technical asbestos and vermiculite removal in camps and industrial buildings: insulation, spray, tile, gaskets, board. Containment, airlocks, negative pressure, HEPA, PPE, waste. CSTC 3.23 — low, moderate or high risk.
A photograph cannot identify asbestos. Characterisation belongs to a competent professional. We do not invent a lab result. We remove once the material is characterised.
Sequence and occupancy
Notice, training, written program, enclosure before the first tool. Air clearance through an independent lab. We do not sign our own clearances. A live camp needs shifts, zones and sometimes temporary lodging.
To price the work
- — Characterisation report
- — Plans, volumes, occupancy
- — Bin access, water, power
- — Site induction and PPE rules




