Containment is the job before removal. Ducts, machines, tape, pressure.
We do not invent air counts. The lab does.
Enclosure before the tool
Without containment it is not abatement. Poly, airlocks, negative pressure, HEPA sized to volume and risk. Material does not move until the enclosure holds. Air tests: independent lab.
To price the work
- — Zone volumes and access
- — Risk level (characterisation)
- — Power for extractors
- — Neighbouring occupancy




