Skip to content
HEPA machine and yellow duct through a containment wall

Service

HEPA containment on industrial jobs

If the enclosure does not hold, the rest is theatre.

Containment is the job before removal. Ducts, machines, tape, pressure.

We do not invent air counts. The lab does.

Enclosure before the tool

Without containment it is not abatement. Poly, airlocks, negative pressure, HEPA sized to volume and risk. Material does not move until the enclosure holds. Air tests: independent lab.

To price the work

  • — Zone volumes and access
  • — Risk level (characterisation)
  • — Power for extractors
  • — Neighbouring occupancy
Request a quote

Questions

FAQ

Do you certify the air?+

Independent lab. Not us.

A project in mind?

Tell us about the work and your site's needs.