Crane, mats, wind, ground. We do not improvise a lift on a Friday afternoon.
Sequence with civil works so the pad is actually ready.
Nobody under the load
Lift plan, capacity, radius, bearing, wind, signaler, exclusion zone. A 60-foot module is not set by eye. Nobody under a load. The crane is often a specialist, or the owner’s. We coordinate the plan either way.
To price the work
- — Masses, dimensions, lift points
- — Pad plan and bearing
- — Clearances (lines, buildings, wind)
- — Who supplies the crane




