Prefabricated modules only work if the ground holds and the lift is planned. We do that work — not camp hospitality.
Licence 13.5 on the register. Winter, wind and access decide the day, not a brochure.
Setting modules
A module is not a camp until it is levelled, anchored and connected. We install, move and prepare strip-out. We do not manufacture the boxes. We do not run the hotel.
Access and frost
A 60-foot module arrives as a convoy. Forest road, bridge, thaw, overhead lines: that decides the day. We price the access window. We do not set on mud to “keep moving”.
To price the work
- — Count, size and mass of modules
- — Supplier and anchor drawings if any
- — Pad plan and crane access
- — Camp occupancy calendar