Skip to content
Benne et excavation sur un chantier québécois

Camp design

Fewer trucks. More treatment on the pad.

Every bin that climbs the road costs. The study cuts volume on site.

Visual-direction illustration. Does not document an LPT INC. job, vehicle or asset.

Preliminary design and exhaustive technical study of all systems — not intended for construction.

Incinerator

Nordic Canada, 1,000 °C, gas scrubber. Study target: 95% mass cut. Permit is not this page.

Wastewater

H2O Innovation MBR. Dried sludge briquettes, yearly haul in the study case.

Preliminary design and exhaustive technical study of all systems — not intended for construction.

Questions

FAQ

Do you guarantee effluent?+

No. The study sizes it. Permits and lab stay with the project.

Industrial | Abatement | Camps

Wherever the camp goes.

Modular camps, industrial assembly, remote pads. Plan. Coordinate. Deliver.